Schema groups
Tenancy, fleet, telemetry, operations, risk, evidence, governance, commercial and ops schema groups.
Internal GCCAP operating surface
GCCAP does not delete operating records, trial packs, hardware activation surfaces or evidence automation layers. They are preserved for authorised client portal, command-centre and internal operating use while the public website stays clean for airline first impressions.
Open portal accessInternal GCCAP surface
Production-readiness phase defines the production database schemas, SQL migrations, tenant isolation constraints, import mappings and verification checks required before GCCAP can run real client telemetry on managed persistence.
StatusInternal / restricted surface. Not part of the public client walkthrough.
Operational layer
P2 converts the Build 30/P1 control plane into a concrete PostgreSQL migration foundation.
Tenancy, fleet, telemetry, operations, risk, evidence, governance, commercial and ops schema groups.
Six ordered migration files covering foundations, tenancy, hardware, telemetry, journeys, risk, reporting and governance.
Explicit tenant scope, client report visibility and Watchdog publication boundaries.
Row count, packet hash, tenant isolation, report evidence, replay and rollback checks.
Decision clarity
GCCAP must clear these before production database migration.
Governance
P2 strengthens GCCAP by moving toward durable evidence infrastructure without pretending local pilot storage is production SaaS.