System readiness
Summarises build-layer status and post-30 production gaps.
Internal GCCAP operating surface
GCCAP does not delete operating records, trial packs, hardware activation surfaces or evidence automation layers. They are preserved for authorised client portal, command-centre and internal operating use while the public website stays clean for airline first impressions.
Open portal accessInternal GCCAP surface
This page is retained for GCCAP operations, trial readiness, hardware activation, evidence automation, historical build records or command-centre use. It is not part of the public client walkthrough.
StatusInternal / restricted surface. Not part of the public client walkthrough.
Operational layer
Build 29 is the last broad system-polish layer before Build 30 release-candidate lockdown.
Summarises build-layer status and post-30 production gaps.
Keeps supplier feed, managed infrastructure and legal/security gaps visible.
Reviews cross-build page and lab consistency before demo or pilot use.
Summarises public, admin, portal, ingest and integration boundaries.
Decision clarity
These gates protect GCCAP from overclaiming before Build 30 and post-30 hardening.
Governance
Build 29 is preparation, not final production.